The State of AI in Dutch Contract Management

Door Richard Steketee

Findings from two workshops at the Nationale Contractmanagement Conferentie
Nieuwegein, 1 October 2026
Author: Mark Smalley, writer and coach at Smalley.IT

Abstract

This report approximates the state of AI in contract management in the Netherlands in 2026, drawn from structured discussion at two workshops with around 100 practitioners and consultants at the Nationale Contractmanagement Conferentie. Most discussion of AI in contracting asks what it does for organisations; this one also asks what it does to the people doing the work and to the relationships they manage. The findings show AI already used widely across the contract lifecycle, but with the role’s future split by contract type — expanding in standardised, transactional work, and shifting toward relationship and judgement in work that depends on relational trust — against a backdrop of governance and policy that has not kept pace with practice.

1. Introduction

Most of what’s written about AI in contracting asks what AI does for contract managers — whether it’s accurate, secure, well-governed, adopted. This write-up is interested in a narrower and less-asked question: what AI also does to contract managers, to the relationships they manage, and to the trust those relationships depend on.

What this is: an approximation of the state of AI in contract management in the Netherlands in 2026, built from structured discussion at two workshops. It is not a formal survey — no sampling frame, no statistical claims — but a qualitative snapshot of what a self-selected group of practitioners and consultants said on one day at the Nationale Contractmanagement Conferentie in Nieuwegein, 1 October 2026.

How to read it: the two workshops were run identically and are treated as one pooled dataset throughout. Findings are grouped by theme (Section 4), not by session. Each thematic section closes with reactions from invited experts, gathered after the event; the author’s own synthesis is kept separate in Section 6 so raw findings and interpretation aren’t blended.

2. Method

2.1 The workshops

Two identical workshops were run at the conference, drawing a combined total of approximately 100 participants across both sessions.

Each workshop followed the same slide-guided structure: a short framing of the conceptual background, followed by a series of structured discussion prompts with freedom for participants to raise other topics. A scribe recorded responses to each prompt live, using a standard capture sheet (facts, opinions, notable quotes, disagreement, provider/customer splits), plus any discussion that arose outside the structured prompts.

2.2 The conceptual frame given to participants

Participants were briefed on the following before the discussion began:

  • Trust is a precondition for economic exchange, met through a mix of contractual assurance and relational goodwill.
  • Contract management shapes relationships as well as contracts — how parties negotiate, interpret and administer an agreement moves where a relationship sits on that assurance/goodwill spectrum.
  • AI is an actant, not an actor: it produces effects but cannot be held accountable for them, unlike the humans and organisations (actors) that deploy it.
  • AI affects contracts and the relationships built around them, but also introduces a relationship of its own — between AI and the contract managers who use it — which reshapes what they do, can do, and become.

2.3 Caveats on the data

This is workshop-sourced qualitative evidence, not a formal study, and should be read with that in mind:

  • Participants were self-selected conference attendees, not a representative sample of the CM profession. As professionals who attend conferences, they are likely to be more engaged than average.
  • Notes were taken live by a scribe rather than transcribed verbatim; the synthesis in Section 4 necessarily compresses and interprets.
  • The two sessions are pooled as a single dataset; where the sessions diverged noticeably on a given point, this is flagged, but no attempt is made to treat them as independent samples.
  • No formal demographic sampling was done beyond the self-reported profile in Section 3.

2.4 Contributing experts

Linda Tonkes and Richard Steketee added their expert commentary on the findings.

3. Participant profile

Drawn from the opening discussion prompt, to give the reader a lens for weighing the findings that follow. All percentages are approximations based on a show of hands.

Practitioner / consultant ~90% practitioners, ~10% consultants
Customer / provider 95% or more customer-side
Formal AI use 75% formal (organisation-provided resources); 25% no formal provision
Confidence using AI 90% confident in their ability to use it effectively

Someone commented that contract managers should be able to fulfil both the customer and provider roles.

Due to the lack of provider-side participants, all input is assumed to be from the customer side.

Concerns mentioned before starting the exploration

There were some concerns about negative effects on employment, and in particular how to develop senior staff if junior jobs are cut. Also some societal and environmental concerns. Someone mentioned that, while there were concerns, they were also curious about the possibilities.

4. Findings

Each subsection below reports on one structured discussion prompt: what was said, where the room disagreed, and where provider and customer perspectives diverged. Expert commentary, gathered after the event, closes out each subsection.

Unless noted otherwise, direct quotes below reflect the customer-side perspective, consistent with the participant profile in Section 3.

4.1 Where and how AI is used in contract management

Prompt as posed: Where and how do you use AI? Where is its greatest potential — across negotiation, proposal, requirements, formalisation, execution, evaluation, renewal, termination?

What was said

No particular stage stood out: AI seems to be used, and to have potential, across the board. Statements of work and risk management were specifically mentioned. It is often used in preparation and for managing multiple contracts efficiently, with the risk of not thinking as much as participants felt they should.

A distinction emerged between using AI for the execution of contract management itself and using it to create templates and other tools that are then used in execution.

AI will probably make managing contracts easier, but managing relationships remains a human activity.

“You have to think for yourself.”
“AI informs me but I still take the decisions.”

Notable threads and disagreements

Some (public) organisations were severely restricted in their use of AI from a policy perspective, leading to them lagging behind other organisations in their ecosystem.

Several comments raised unresolved questions about trust and accountability in AI-assisted work, rather than settled views.

“How do you know that AI is right?”
“Who is accountable?”

Expert commentary

The findings suggest that AI is already becoming part of the normal toolkit of contract managers rather than being used in specific phases of the contract life cycle. Participants did not identify a single dominant use case. Instead, AI appears to be spreading horizontally across activities, from preparation and analysis to drafting and review.

The recurring emphasis on human judgement is notable. Participants did not describe AI as replacing decision-making but as extending their capacity to process information efficiently. This reflects that the technology is valued for acceleration and augmentation, while decision making is the responsibility of the contract professional.

At the same time, the questions “How do you know that AI is right?” and “Who is accountable?” indicate that the use of AI in contract management is that of an individual tool, instead of a process embedded agent that is subject to policy, process and governance. The challenge for organizations is not simply introducing AI tools, but establishing clear standards for validation, transparency, and responsibility.

4.2 Concerns about AI in contract management

Prompt as posed: What issues are you concerned about? Where did provider and customer perspectives differ?

What was said

Organisations felt they should inform the other party about their use of AI. There is limited trust in the quality of AI output, and as yet no direct interaction between AI agents across organisations — AI is only used internally so far.

“The human factor is crucial.”
“Always a human in the loop.”
“AI as sparring partner — I decide.”

Notable threads and disagreements

Some suppliers were criticised for not using AI to check their own work.

AI is sometimes used against policy but with anonymised data; some participants disapproved of this.

Several quotes pointed to unresolved tension between speed and human judgement, and to doubts about the ethical basis for trusting AI output.

“You have to be able to defend your work.”
“The right balance is hard to find — policy-execution, speed-humanity.”
“You can’t trust AI — there is no ethical framework.”
“Can I trust the legal adviser if they use AI?”

Expert commentary

A central theme in the discussion was trust. The tension identified between speed and human judgement is unlikely to disappear. The repeated insistence on a “human in the loop” can be interpreted as an attempt to preserve accountability in situations where the output is not trusted enough to assign responsibility to technology.

The discussion also revealed an emerging transparency dilemma. If AI is used to prepare analyses, recommendations, or contractual positions, to what extent should that use be disclosed to counterparties? Participants generally favoured openness, but the practical boundaries remain unclear. As AI becomes embedded as a stand-alone actor in routine work, organisations may need explicit norms regarding disclosure, validation, and acceptable use.

4.3 The assurance/goodwill mix

Prompt as posed: How much relational goodwill is appropriate? How does contract management affect the assurance/goodwill mix?

What was said

The right mix depends on the type of product — highly standardised products require less investment in the relationship — and on shared commercial interest.

Purchasing begins with a need from a person, and the purchasing process leads to a contract for a person: the human origin and destination of a contract were seen as persisting regardless of AI’s role in between.

Notable threads and disagreements

Communication between (AI) agents was seen as tricky when sensitive information is involved.

Some participants went further than “simpler”: AI could eliminate the need for the specialised contract manager in its current form. This sits in tension with 4.4 below, where the contract manager’s role is instead described as shifting rather than disappearing.

Expert commentary

The discussion reinforces a familiar principle of contract management: good contracts create structure and flexibility; relationships create adaptability when unanticipated circumstances occur. Participants argued that the appropriate balance between control and relationship, differs from contract to contract.

What AI changes is not this underlying principle, but the ease with which certain contract-related activities can be performed. As routine analysis and administration become more automated, organisations can selectively invest proportionally in human goodwill for (types of) contracts that need this. In that sense, AI will change the required skillset for a contract manager.

The suggestion that AI might eventually remove the need for human contract managers should not be dismissed entirely in every scenario. Historically, automation has often eliminated specific tasks without eliminating the broader professional role. The more likely scenario is that human expertise shifts from processing information towards interpreting context, exercising judgement and manage relationships where competing interests must be balanced.

4.4 Perceived change in self or others

Prompt as posed: Have you perceived any change in yourself or others as a result of AI’s presence in contract management?

What was said

The centre of gravity in the role shifts towards the relationship: AI can discover issues more quickly, but the contract manager still has to act on them.

Notable threads and disagreements

A focus on compliance and efficiency would shift the balance back towards the contract rather than the relationship — pulling in the opposite direction from the point above, and from the more radical suggestion in 4.3 that the role could be eliminated.

Interaction via AI was also flagged as a risk to human interaction and social cohesion more broadly, beyond the contract management role itself.

Expert commentary

The points made are in line with the changes in the profession described above. We believe that the future role of the contract manager is unlikely to be determined by technology alone. Organisational priorities, the need for process-based working and management philosophy will influence whether AI becomes a tool for strengthening relationships or for intensifying compliance-oriented control. This will differ per (type of) organization.

5. Reaction to the concluding assertions

The workshop closed with six assertions, presented to participants for confirmation, qualification, or challenge. This came at the end of each session, when time was limited, so discussion here was lighter than in Section 4. Participants broadly agreed with the assertions as stated; this section should be read as indicative rather than a tested result.

1. Trust is a precondition for economic exchange

2. Contractual assurance and relational goodwill build this trust

3. Contract management shapes relationships as well as contracts

4. AI affects contracts, contract managers, and relationships

5. That relationship affects how organisations are trusted

6. So, manage what AI does for you and what it does to you — both as organisations and as individuals

Expert commentary on the assertions as a whole

Taken together, the workshop findings suggest that participants largely accept the conceptual chain presented in the six assertions. The discussions repeatedly returned to trust, accountability, and human responsibility, supporting the view that contract management remains fundamentally a socio-economic activity rather than a purely administrative one. We would like to add the importance of the role of regulators and lawmakers that provide the context and conditions for trust.

Perhaps the most important observation is that AI affects contract management at two levels simultaneously. It changes how contracts are analysed, administered, and monitored, but it also changes how contract managers think, work, and interact with others. Organisations therefore need to manage not only the risks and opportunities associated with AI outputs, but also the longer-term impact of AI on their processes, professional capabilities, organisational culture, and inter-organisational trust.

6. Closing and implications

The workshops reflect a professional practice that is already using AI widely, and is still working out what kind of thing it is using. Participants and experts alike kept returning to the same unresolved question — is AI a tool that contract managers direct, or an actant that is starting to act on their behalf? — and most of the open concerns in this report trace back to that ambiguity rather than to AI’s capability itself.

For organisations, three implications stand out:

  • Governance needs to catch up with practice, not the other way round. AI use is already outpacing the policies meant to govern it — several participants described informal or anonymised workarounds precisely because formal provision lagged behind what they needed. Closing that gap matters more for trust than any improvement in AI output quality, since the open questions raised (“who is accountable?”, “how do you know AI is right?”) are governance questions, not technical ones.
  • How the specialised contract manager role develops depends on the mix of contracts, not a single trend. For standardised, transactional work, AI’s role is likely to keep expanding and could eventually displace parts of the role as currently defined. For relationally complex work, the expert commentary’s reading looks the more durable one: the task shifts from processing information to interpreting context and judgement, rather than disappearing. Organisations should expect — and plan for — both shifts happening at once, in different parts of their contract portfolios.
  • The relationship between AI and the contract manager is now itself something to manage, not just the relationship between organisations. This is the report’s central reframe: most governance conversations ask what AI does for an organisation; this one asks what it does to the people doing the work, and to the human interaction that relational trust has always depended on. The risk to social cohesion raised in 4.4 — less face-to-face and voice-to-voice contact, echoing what email and messaging already started — deserves a place in that governance conversation alongside accuracy and security.

One addition from the expert commentary is worth closing on: trust between organisations doesn’t rest on bilateral goodwill alone — it sits inside a wider context of regulation and legal norms that the workshops didn’t probe directly. As AI’s role in contracting grows, that external layer of trust-conditions is likely to become as consequential as anything negotiated between the parties themselves.

Zoeken

Onderwerpen

Over CM Partners

CM Partners is de expert op het gebied van contract­manage­ment. We bieden consultancy en trainingen aan om zo de inrichting, professiona­lisering en uitvoering van contract­management aan te kunnen pakken binnen uw bedrijf. Een belangrijk uitgangspunt is daarbij onze methode voor contractmanagement: CATS CM®